Hazard study

Context & Issues
In the context of the project to install a cogeneration plant at the Marcq-en-Barœul production site (the largest yeast factory in the world since its creation in 1968), Artelia is performing a study that will be incorporated directly into a statutory public information document in order to complete the existing hazard study of the site.
The objective of the assignment is to prove that the level of risk resulting from modifying the gas supply system (new 200 mm diameter pipe) is acceptable, and to provide decision aid with regard to the pipe route on site.