Environmental impact assessment and safety study
Capacity: 1398.29 MW

Context & Issues
Preparation of statutory environmental and safety studies required to obtain authorisation to exploit the new 1398.29 MW combined cycle power plant at Jijel (El Milia) in conformity with Algerian legislation:
- Regulatory framework
- In-depth measurements to determine the baseline environmental situation: acoustics, suspended dust, soil and water, with a view to describing the baseline situation of the site and its environment
- Environmental and social impact assessments
- Definition of attenuation measures
- Preparation of the environmental management plan
- Safety study