Upgrade to current standards

Project characteristics
- 65 m long extension to runway 12/30
- Creation of runway end safety areas (RESA), involving the construction of an original engineered materials arresting system (EMAS)
- Redevelopment of the port of Sainte-Marie in the immediate vicinity