Expert appraisal of signal and communication circuits

Context & Issues
Complete design and construction supervision services for the creation of a Bus Rapid Transit line.
Project characteristics
- A total length of 8.8 km (a 5.3 km trunk section, the 1.5 km IUT branch and the 2 km Les Clausonnes branch).
- 17 stations.
- Creation of a terminal at the Antibes multimodal transport interchange (bus lines, railway station, etc.).
- 11 articulated vehicles.