Context & Issues

Design and construction supervision services for a bus rapid transit (BRT) line between Place Castellane and the Luminy campus in Marseille. 

Project characteristics

The line is 9.5 km long.

  • Probabilistic risk assessment and preliminary design.
  • Detailed design, assistance with works contract, supervision of works, approval of working designs, assistance with acceptance procedures, organisation, planning and coordination.
  • Provisional detailed design in downgraded mode from Castellane to Mazargues (4.3 km) and final detailed design for Mazargues – Luminy (5.7 km).