BESS installation and high-voltage substation in Orbec

90kV/20kV

private substation

30MW/60MWh

stationary battery storage system

CONTEXT & ISSUES

The project plans to build a 60MW/120MWh storage facility connected to the RTE substation adjacent to the site via a private 90kV/20kV substation. 

This assignment concerns Orbec 1: a private 90kV/20kV substation and a 30MW/60MWh stationary battery storage system.  

Artelia supports the client as BESS project manager for the design and construction of the storage facility.