Water Resource Management (IWRM) in the Sanaga basin

Contributing to the sustainable management of water resources throughout a major river in Cameroon
Environmental restoration of the river Drac / PAPI Drac

Recovering the natural river flow
Adria Tower

Reuse of materials during restructuring
Renovation of the Haliotis wastewater treatment plant

At the cutting edge of the ecological transition.